Wind turbine cleaning and de-icing by drone
Hot pressurised water with detergent, fed from the ground through a 150 m hose. No platforms, no ropes, and the turbine stopped only for the duration of the wash.
Why clean the blades
A blade’s leading edge accumulates insects, dust, pollen and oil residue. That layer alters the aerodynamic profile and can reduce annual output by 2 to 5 % on heavily soiled farms, as well as accelerating leading-edge erosion. On the tower and nacelle, oil stains and surface rust hinder inspection and degrade the coating.
Until now, cleaning required rope-access technicians or lifting platforms, with the machine stopped for one to three days in optimal weather conditions. With the drone, a two-person team cleans a machine in a few hours and moves on to the next. We work on wind farms in any country with the Helion T1, a system we design and build ourselves.
Blade de-icing
On mountain wind farms, ice on the blades forces turbines to stop for days until it melts on its own. With hot water applied from the drone we return the machine to service the same day, without waiting for natural thaw and without exposing anyone to falling ice.
The operation is planned with the turbine stopped and locked, and we monitor ice falling from the blade throughout the process.
Cleaning a blade with the Helion T1
The drone runs along the leading edge with the lance while the hot water unit works on the ground. No ropes, no platform, with the machine stopped only for the duration of the wash.
More videos of campaigns and systems on our YouTube channel.
The hot water goes up the hose, not in the drone
The drone carries only the coupling platform, a 2.5 m pole and the lance: about 9 kg. The hot pressure washer and the generator stay on the ground, next to the water tank. A lightweight 150 m hot-water hose connects the two ends. The result is a drone that flies light, with enough endurance to complete a whole blade, and a jet of pressurised water with detergent and up to 155 °C at the unit’s nozzle.
The pilot aims the jet with the drone and the ground operator controls pressure, temperature and detergent. Between the two they clean the three blades, the tower and the nacelle without anyone going up.
maximum working height
hot water for de-icing and grease
pressure adjustable to the surface
maximum flow
pilot and ground operator
all the equipment fits in a trailer or van
Blades, tower and nacelle
Blade cleaning
Insects, dust, pollen, oil and grease marks from the leading edge, suction and pressure sides. Hot water with biodegradable detergent and a rinse.
De-icing
Hot water on the iced areas to return the machine to service without waiting for the thaw and without technicians under the blade.
Tower and nacelle
Oil and grease stains, surface rust, bird droppings and environmental dirt. Leaves the surface ready for inspection or repainting.
What you get: a cleaning report per turbine with before-and-after photos of each blade, tower and nacelle, the detergent used, water consumption and downtime hours. If you combine it with our blade thermographic inspection, a clean blade gives a more reliable thermal image.
If the wind farm wants to do it with its own staff, the system we use is the Helion T1, which we sell with operator training included.
Wind turbine cleaning by drone versus crane and rope access
Rope access and cranes put technicians at height and keep the machine stopped for one to three days, and that is in good weather. The drone sends nobody up, works with hot water and detergent, and keeps the machine stopped for only a few hours.
| Method | Downtime per turbine | People at height | Market cost per turbine |
|---|---|---|---|
| Rope-access technicians | 1 to 3 days in optimal weather | Yes | €7,600 – 11,000 |
| Crane or aerial work platform | 1 to 3 days in optimal weather | Yes | €7,300 – 11,000 |
| Helion T1 drone | 2 to 4 hours | No | On request |
Indicative market costs for the full cleaning of a 1.5 MW wind turbine with a 78 m hub height, excluding VAT, at 2026 prices.
Frequently asked questions
How long is the turbine stopped?
Between 2 and 4 hours per machine for a complete clean of the three blades, depending on size and soiling. The tower and nacelle are also cleaned with the machine stopped, but can be done on a second visit.
What detergent do you use?
Biodegradable detergents compatible with the blade gelcoat. If the blade manufacturer requires a specific product, we use it. The system accepts any liquid detergent.
And the water?
We need a clean water filling point or a tanker at the wind farm. We carry a 1,000 l auxiliary tank in the trailer to work independently between refills.
In what wind can you work?
Up to the drone’s limit, normally 10 to 12 m/s. Above that we stop. With gusts at the blade the jet loses precision and we prefer to wait.
How often should the blades be cleaned?
It depends on the area and the type of soiling. As a guide, one clean every two years.
How much does it cost to clean a wind turbine?
It depends on the number of machines, the hub height, access to the wind farm and whether there is water on site. With that information we send a price per turbine.
How high can you reach, and on which models?
Up to a working height of 150 m. It does not depend on the manufacturer or the model.
Does pressurised water damage the blade?
No. The pressure is adjusted between 30 and 210 bar depending on the surface, and the detergents are compatible with the gelcoat.